Pipeline sections and fittings staged behind caution tape before hydrostatic testing
Back to Services

NDE & Inspection

RWR's quality program coordinates inspections and third-party NDE verification for project testing requirements.

Pipeline sections and fittings staged behind caution tape before hydrostatic testing
Pipeline specified for 10% radiographic testing (RT), shown during preparation for hydrostatic testing. No test result is shown.

RWR's quality program coordinates various forms of inspection and independent third-party non-destructive examination (NDE) verification.

Examination requirements and hold points are planned alongside fabrication and testing preparations. The pipeline pictured here is specified for 10% radiographic testing (RT) and is being prepared for hydrostatic testing.

Inspection and test documentation is coordinated with the applicable project requirements for final turnover.

Required Request for Quote Inputs

  • Governing Code (ASME, API, AWS)
  • Required NDE Methods (RT, PT, MT, UT)
  • Percentage of Examination required
  • Acceptance Criteria documentation
Request Quote For NDE

Frequently asked questions about nde & inspection

Does RWR perform non-destructive examination itself?

RWR coordinates inspections and independent third-party NDE verification as part of its project quality program. The method and acceptance criteria depend on the project requirements.

What should I provide for NDE coordination?

Provide the governing code, required examination methods and percentages, acceptance criteria, and documentation requirements.